Sr. No Project Name Company Name Head (m) Rating (MW) Type of Turbine RPM Location Remark
1. lower Chhote Khola HPP Pashupati Environmental Pvt. Ltd. 115.266 2 x 0.5 + 10% COL 2 Jet Horizontal Pelton 500 Gorkha, Nepal All supplies completed. Erection activities under progress
2. Jeuli Gad Rangun Khola Pvt.Ltd. 77.935 1 x 1.0 + 10% COL Horizontal Francis 1000 Bajhang, Nepal 50% supplies completed
3. Upper Rawa Khola Upper Rawa Pvt Ltd 149.4 2 x 1.5 + 10% COL 3 Jet Horizontal Pelton 500 Khotang, Nepal 10% supplies completed
4. Lower Tadi Khola Buddha Bhumi Power Pvt Ltd 87.78 2 x 2.5 Horizontal Francis 750 Nuwakot, Nepal Under Design
5. Richet Khola Richet Khola Pvt Ltd 259.82 2 x 2.5 2 Jet Horizontal Pelton 750 Gorkha, Nepal Under Design
6. Chauri Khola Chauri Hydropower Pvt Ltd 156.84 2 x 3.0 + 10% COL Horizontal Francis 750 Kavre, Nepal Under Design
7. Balephi A Moonlight HPP 79.60 3 x 7.38 Horizontal Francis 428.6 Sindhupalchowk, Nepal Under Design

NEON ENERGY PROJECT REFERENCE LIST (Limited Scope): –

Sr. No Project Name Company Name Head (m) Rating (MW) Type of Turbine RPM Location Remark
1 Upper Naugarh API Power 153.14 2 x 4 Horizontal Francis 1000 Darchula, Nepal Scope – complete water to wire. 80% supplies are completed.
2 Kabeli B1 Arun Kabeli 85.3 2 x 12.5 Horizontal Francis 500 Panchthar, Nepal Scope – (BOP+E&C)*. All supplies completed. Under erection.
3 Iwa Khola Rairang Hydropower 93.45 2 x 5 Horizontal Francis 750 Panchthar, Nepal Scope – (BOP+E&C)*. All supplies completed. Under erection.
4 Upper Dordi Liberty Energy 300.68 2 x 12.5 5 Jet Vertical Pelton 500 Lamjung, Nepal Scope – (BOP+E&C)*. 30% supplies completed.
5 Khani Khola Sasha Engineering 594.16 2 x 15 2 Jet Horizontal Pelton 600 Dolakha, Nepal Scope – (BOP+E&C)*. Under Design
6 Upper Mailung A Energy Engineering 439 2 x 3.21 2 Jet Horizontal Pelton 1000 Rasuwa, Nepal Scope – (BOP+E&C)*. All supplies completed. Under erection.
7 Molung Khola Molung Hydropower 100.6 2 x 3.5 Horizontal Francis 750 Okhaldhunga, Nepal Scope – (BOP+E&C)*. Plant Commissioned in January 2018
8 Puwa Khola Puwa Khola One 108 2 x 2 Horizontal Francis 1000 Ilam, Nepal Scope – (BOP+E&C)*. Plant Commissioned in May 2017
9 Hadi Khola Centre Power Development Service 200 2×0.5 Horizontal Pelton 750 Melamchi, Nepal Service & Rehab supply all control & relay panel.

* BOP means the balance of plant items which includes the transformer, switchyard equipment, DG Sets, Crane, etc. E&C means Erection & Commissioning.

SCHIMMER INFRA (EPC) PROJECT REFERENCE LIST: – (Limited Scope): –

Sr. No Project Name Company Name Head (m) Rating (MW) Type of Turbine RPM Location Remark
1. Upper Puwa Peoples Power Pvt. Ltd 219.30 2 x 2.5 Horizontal Francis 600 Ilam, Nepal EM Under Design, Civil work under progress
2. Down Piluwa River Fall company Pvt Ltd 99.44 2 x 4.75 MW + 10% COL Horizontal Francis 750 Sankhuwasabha, Nepal Under Design
3. Isuwa Khola Dolakha Nirman company Pvt Ltd 914.05 4 x 25 2 Jet Horizontal Pelton 750 Sankhuwasabha, Nepal Under Design
4. Upper Lapchey Energy Venture 434.25 3 x 17 + 10% COL 4 Jet Vertical Pelton 750 Dolakha, Nepal Under Design